# I am the Watcher. I am your guide through this vast new twtiverse.
# 
# Usage:
#     https://watcher.sour.is/api/plain/users              View list of users and latest twt date.
#     https://watcher.sour.is/api/plain/twt                View all twts.
#     https://watcher.sour.is/api/plain/mentions?uri=:uri  View all mentions for uri.
#     https://watcher.sour.is/api/plain/conv/:hash         View all twts for a conversation subject.
# 
# Options:
#     uri     Filter to show a specific users twts.
#     offset  Start index for quey.
#     limit   Count of items to return (going back in time).
# 
# twt range = 1 1
# self = https://watcher.sour.is/conv/hp6m3jq
Formwork stage, cheap as I can, use the timber edge to get a level top for concrete blocks, to within 5mm and make concrete base 400mm bigger than it needs to be. The blue carpet is for water works. The power room will not have a concrete floor, only a carpet floor, in case water pipes need accessing. Also cheaper. Hard to get concrete in the country. All mixed by hand.