Took me like half an hour to find a photo from July 2021 were the lake was actually operational (I reckon I should start tagging my photos). In the middle left you can see the top of the drain structure. It's basically a big pipe that allows water to run out of the lake into the other other side of the dam. With a mechanism of movable damming boards you can regulate the level of the lake:
[](https://lyse.isobeef.org/waldspaziergang-2021-07-17/01.jpg)
From the draining phase in October 2023, the lake looked like that. Pretty much emptied lake from the same point of view:
[](https://lyse.isobeef.org/waldspaziergang-2023-10-05/21.jpg)
Still standing drain tower to be removed:
[](https://lyse.isobeef.org/waldspaziergang-2023-10-05/22.jpg)